New Release – Studio UG v2.6 and EPS v3.1.56

Share This Post

Datamine is pleased to announce a new release of Studio UG v2.6.20 and Enhanced Production Scheduler (EPS) v3.1.56. This update introduces new features and improvements and is recommended for all users.

Studio UG v2.6

Studio UG delivers an unparalleled, integrated toolset for underground mine planning. Whether for an active mine production environment or a potential mine, from concept through to bankable feasibility stage, Datamine’s solution will help you design, plan and schedule all aspects of your underground mine.

Features and Improvements:

  • Short Term UG Planning Tool
  • String Validation Improvements
  • Report Using Legend Bins
  • Include Dilution on Evaluation Commands
  • Interactively Edit FXS Shapes
  • Dynamic String Evaluation on any Plane
  • Improved Connection Between EPS and StudioUG

DOWNLOAD STUDIO UG FROM OUR SUPPORT PORTAL

Enhanced Production Scheduler (EPS) v3.1.56

Enhanced Production Scheduler (EPS) is a powerful mining package which allows users to carry out the activities associated with scheduling and monitoring critical resources. EPS has a full Gantt chart scheduler built specifically for mining with industry-specific functionality not available in off-the-shelf schedulers. EPS is integrated with the Studio UG mine design and scheduling systems, however it can be used as a standalone application.

About this Update:

This is a minor version update for Enhanced Production Scheduler (EPS). It is provided to distribute specific code changes in response to client feedback since the last release was published. This version also introduces new functionality.

EPS and STUDIO PRODUCT COMPATIBILITY

  • This version is designed to work alongside Studio OP version 2.9 and later versions.
  • This version is designed to work alongside Studio UG version 2.6 and later versions.
  • This version requires InTouch EPS v3.5.40 or later for schedule visualization (installed with EPS)

DOWNLOAD EPS FROM OUR SUPPORT PORTAL

For more information on Studio UG or EPS or, please contact your nearest Datamine office.

Latest Posts

Acquisitions

DATAMINE EXPANDS ASSET MANAGEMENT SOLUTIONS

15 April 2024 – Datamine is pleased to announce an expansion of its asset management solution offering through parent company Vela’s acquisition of Samtech. Based in Santiago, Chile, Samtech has more than 600 customers and is a leading supplier of fleet management, machine performance and telematics software and hardware. Samtech’s fleet management solution enables comprehensive

Studio RM Pro advantages
Blog

Studio RM Pro: Les enjeux majeurs de l’estimation des ressources en mine : Comprendre le coût d’une erreur.

Précision et fiabilité sont primordiales dans le cadre de la validation de ressources minérales pour s’assurer que le modèle représente de manière précise et fidèle les données. Les considérations correctes de la classification de ressources minérales pour créer de la solidité dans la transition de ressources à réserves aident l’entreprise à accomplir ses plans de production,

Scroll to Top